| Facility |
Cost |
| Fences | $ |
| Water distribution systems | 128,045 |
| Chilled water distribution system | 9,515,700 |
| Gas distribution system | 35,252 |
| Compressed air distribution system | 10,480 |
| Electrical distribution system | 2,233,853 |
| Steam distribution system | 649,600 |
| Sanitary sewer system | 218,748 |
| Storm sewer system | 465,021 |
| Chemical disposal | 37,327 |
| Surface areas: |
| Roadways and related bridges | 130,000 |
| Sidewalks and related bridges | 142,000 |
| Parking areas | 953,000 |
| Tennis courts | |
| TOTAL |
$14,669,386 |
|
1
Actual cost of facilities was used when available. However, the construction cost of a building or group of buildings included the facilities serving those buildings, in which case cost was estimated at prices applicable at the time of construction, and the estimated cost of facility was deducted from the cost of the building.
Source: DES PCB.
|